Home Home Photogallery
Profile Products Quality R & D Clients Inquiry form Media R & D Certificate
 
 
 


Mazda Has The Largest Most Complete Selection Of Pipeline Desuperheater























Recommended Installation Practice For Pipeline Desuperheaters

Recommended Installation Practice For Pipeline Desuperheaters
*Click The Image To View Its Full Size

NOTE:

  1. SPRAY WATER CONTROL VALVE SHOULD BE LOCATED AS CLOSE TO THE DESUPERHEATER AS POSSIBLE.
  2. TEMP SENSOR SHOULD BE INSERTED SUCH THAT IT IS EXPOSED TO
    STEAM FLOW TO OBTAIN AN EVEN TEMPERATURE CONTROL.
  3. IN CASE REQUIRED STRAIGHT DISTANCE AFTER THE DESUPERHEATER
    IS NOT AVAILABLE AS INDICATED, CONSULT OFFICE.
  4. PRESSURE AND TEMPERATURE SENSORS SHOULD BE LOCATED
    AS CLOSE TO POINT OF USAGE AS POSSIBLE, BUT BEFORE STEAM DISTRIBUTION.
  5. BLRF FLANGE INDICATED AT CATCH POCKET SHOULD BE OPENED FOR CLEANING OF WELDING BITS, PIPE MUCK AND DIRT DURING SHUTDOWN.
 


 

| Profile | Products | Quality | R&D | Clients | Inquiry Form | Media | Certificate
| Feedback | Contact Us | Photogallery | Article | Questionnaires | Home |

  Site Powered By Bitscape Solutions Home
Photogallery Contact Us Feedback